Xuzhou Bonovo Machinery & Equipment Co.,Ltd

Get in touch

Industry dynamics

Industry dynamics

Home >  News >  Industry dynamics

The importance of snow removal equipment for loaders

Oct 10, 2024

Snow blower standard

Now the more commonly used snow blower standards are as follows:

First, the maximum residue thickness Hmax after snow removal is identified as an indicator, which is due to differences in road levels.

For critical sites without snow, snow removal criteria are based, including:

(1) overload lane, hard shoulder, speed change lane without snow;

(2) There is no main line bridge and overpass on the slope;

(3) No snow in the central dividing area, hard shoulder, roadside, bridge against wall;

(4) Horizontal drainage is adopted in the central partition area, drainage hole bridge, and slope removal of drainage flume;

(5) Toll Gate, toll plaza no snow;

(6) There is no snow in the parking lot in the service area;

A snow blower manufacturer

And some snow removal standards as the initial snow time limit, the operation time requirements:

(1) Snow cover is required to be completed within 3 days;

(2) Heavy snow is required to be completed within 5 days;

(3) Heavy snow or blizzard requirements within 10 days;

2. Snow plow timing

The strength of the snow has a big impact on the difficulty of snow removal. The relationship between the shear strength of snow and temperature and density changes, it can be seen that with the increase of density and temperature, the strength of snow (pressure, cutting) increases significantly, for snow removal operation is difficult so before snow removal, high temperature snow is the best time without compression.

Choose BONOVO for high-quality, customizable brush cutters for skid steers with fast delivery. Contact us today to discover how our superior products can enhance your land management tasks!

8.jpg