In order to ensure the overall performance and technical indicators of the hydraulic system of the loader, after testing and adjusting the hydraulic components, the whole hydraulic system should be comprehensively and carefully adjusted to achieve reasonable coordination of each component and ensure the stable and reliable operation of the hydraulic system.
The following small loader manufacturers will introduce you to the load monitoring and commissioning of small loaders. The purpose of load debugging is to check whether the hydraulic system can meet the predetermined working requirements after bearing the load, such as speed load characteristics, leakage severity, working capacity meets the design or maintenance requirements, and whether the oil temperature of the hydraulic system is within the allowable range.
Load debugging should be carried out under various possible working conditions to test its ability to adapt to various working conditions. The whole commissioning process of small loaders should be based on the principle from simple to complex, from single action to compound action, and all actions of the working device should be tested. During the test process, the whole process of pressure, flow, temperature, noise and leakage should be monitored, and any problems found should be recorded in time.
When serious problems occur, inspection and exclusion should be stopped immediately.
For the performance parameters with inaccurate values, the relevant adjustment device should be adjusted according to its working principle, so that the performance parameters in the debugging process of the whole machine gradually become normal.
When the adjustment is not effective, it should be inspected and analyzed to find out the cause and repair or replace the relevant parts. The above is a summary of the knowledge of load monitoring and debugging of small loaders.