Since most of the main engine has been reserved for the installation of the oil port joint, when installing the excavator crushing bucket, it is only necessary to connect the pipeline, the joint and the crushing bucket together according to the requirements of the instructions.
Tools needed for excavator crushing bucket: toolbox, crushing bucket, high-pressure hose.
Excavator crushing bucket installation method and steps:
1. Remove the pin sleeve on the bucket and put it aside for use.
2. Put the front cover of the excavator forearm into the ear plate of the excavator crushing bucket shell, install the pin pin sleeve, manipulate the forearm of the excavator, lift the crushing bucket, lower the "cow bone" of the forearm, and install the other part of the pin pin sleeve.
3. Use two high-pressure hoses to connect the hydraulic tubing on the forearm to the middle cylinder of the crushing bucket, tighten the bolts, and open the valve of the hydraulic tubing on the forearm.
4, after installation, test the machine, check the overall situation of operation, appropriate adjustment.
In addition, it should be noted that in the process of replacing the excavator crushing bucket, because the hydraulic pipeline is easy to be contaminated, it is necessary to use the internal thread plug to block the pipeline, in order to prevent dust pollution and avoid the pollution of hydraulic oil.
Choose BONOVO for high-quality, customizable brush cutters for skid steers with fast delivery. Contact us today to discover how our superior products can enhance your land management tasks!
2024-09-18
2024-09-18
2024-07-03
2024-03-08
2024-03-08
2024-03-08