Xuzhou Bonovo Machinery & Equipment Co.,Ltd

Get in touch

Industry dynamics

Industry dynamics

Home >  News >  Industry dynamics

Quick replacement of slip loader fittings Точикистон

Nov 11, 2024

Changing slip loader attachments is quick and easy, designed for busy contractors who need to maintain productivity. How you replace the slip loader attachment depends on the type of slip loader and whether it has a manual or electric quick connector.

Attachment without hydraulic pressure:
1. Lay the accessory flat, making sure there is enough room behind the accessory to adjust the connection.
2. Start the engine, lower the boom, and tilt the quick change plate forward.
3. Drive the machine slowly to the auxiliary device, align the top edge of the quick change plate with the upper edge of the auxiliary device connection plate, slowly raise the boom, and clamp the upper edge of the quick change plate into the upper opening slot of the auxiliary device connection plate.
4. When the upper edge of the quick change plate is stuck into the upper opening slot of the auxiliary device connecting plate, slowly tilt the quick change plate upward, so that the lower edge of the quick change plate slowly slides into the lower edge of the auxiliary device connecting plate.
5. Turn off the engine.
6. Rotate the pin to the locking position and fix the accessory to the machine.
7. Start the engine, lift the accessory off the ground, check the bottom of the accessory connecting plate, and make sure that the quick change pin on the quick change plate is significantly more than the bottom of the accessory.

Accessories with hydraulic pressure connection:
1. Lay the accessory flat.
2. Start the engine, lower the boom, and tilt the quick change plate forward.
3. Drive the machine slowly to the auxiliary device, align the top edge of the quick change plate with the upper edge of the auxiliary device connection plate, slowly raise the boom, and clamp the upper edge of the quick change plate into the upper opening slot of the auxiliary device connection plate.
4. When the upper edge of the quick change plate is stuck into the upper opening slot of the auxiliary device connecting plate, slowly tilt the quick change plate upward, so that the lower edge of the quick change plate slowly slides into the lower edge of the auxiliary device connecting plate.
5. Turn off the engine.
6. Rotate the pin to the locking position and fix the accessory to the machine.
7. Operate the handle of the control auxiliary device back and forth to relieve the pressure of the hydraulic pipe.
8. Remove the dust cap, align with the quick connector, and press into the connector on the boom.
9. Start the engine, lift the accessory off the ground, check the bottom of the accessory connecting plate, and make sure that the quick change pin on the quick change plate is significantly more than the bottom of the accessory.

Choose BONOVO for high-quality, customizable brush cutters for skid steers with fast delivery. Contact us today to discover how our superior products can enhance your land management tasks!

0(c003e8fd6a).png